Most acceptance disputes on custom equipment come from definitions that were never aligned: is cycle time theoretical or measured, does yield count incoming defects, does availability include changeover time.
We suggest writing the three sets of data in checkable form at the proposal stage: under which conditions the per-part cycle time was measured, who sets the yield criteria, and whether planned downtime is included in availability. Once that is clear, the acceptance method can be agreed and later changes have a basis.
For projects that need linked production, the line-level cycle time and the number of buffer positions should also be agreed, so that every machine can meet its own target while the line as a whole still does not reach capacity.